101 Pnc Plastic No-Caulk Shower Drain

FOB Price: US$3.00 / Piece
Min. Order: 200 Pieces
Min. Order FOB Price
200 Pieces US$3.00
Port: Ningbo, China
Transport Package: Exported Package
Payment Terms: L/C, T/T

Similar Items

Loading...

You May Like

Loading...

Product Description

Company Info

Address: Lingang Industrial Park, Xizhou, Xiangshan, Ningbo, Zhejiang, China
Business Type: Manufacturer/Factory
Business Range: Apparel & Accessories, Consumer Electronics, Industrial Equipment & Components, Manufacturing & Processing Machinery, Metallurgy, Mineral & Energy, Packaging & Printing, Security & Protection, Tools & Hardware
Management System Certification: ISO 9001
Company Introduction: NINGBO RUNNER INDUSTRIAL CORPORATION is a subsidiary of Runner Group that focuses on the field of healthy home. It has the "Runner Industrial Park" of nearly 140, 000 square meters in Xiangshan, Ningbo. Since its establishment, it has achieved steady development with an ever-increasing annual turnover, and has been awarded the National High-tech Enterprise.

A Recognized name for over 33 years, Runner′s Reputation is built on quality, experience, service and teamwork. Now with strong capabilities in product design, mold fabrication, plastic injection, metal stamping, electroplating and powder coating, we are providing a wide range of products covering plumbing, HVAC, hardware industry. Our hardware products consist of pipe hangers, pipe couplings, pipe clamps, Pipe supports, pipe struts and fittings. All products are manufactured to meet the highest standards in the industry. They are approved by or confirm to FM, UPC, MSS and NFPA.

As a qualified OEM/ODM manufacturer, Runner is dedicated to innovating new production processes, finding ways to improve existing products, creating new ones for new products for new markets and responding more intelligently to customers′ needs.

WISDOM FOR THE FUTURE

The Company has established the major laboratories in order to provide product surface treatment, product functionality, raw material physical properties, geometric size measurement and verification and management of testing equipment, so that products can meet international or national standards and customer standards. Entering the stage of intelligent manufacturing, the Company has established its Dust-Free Workshop and Modern Warehouse Logistics Center for equipment intellectualization, MES, PLM and ERP integrated information system, large-scale three-dimensional logistics center and highly-coordinated strategic supply chain system to provide customers with more stable and effective rights and interests.

QUALITY CONTROL

Over the years, Ningbo Weilin has built up a good reputation in the industry by virtue of its innovative process research and development technology, more efficient flexible manufacturing capabilities and rigorous and pragmatic customer services. It is believed that the mission of "leading human run to a new civilization of healthy home" will be driven by its vision of "Runner Inside, My Home".

CONTINUOUS INNOVATE

The Company is a comprehensive industrial manufacturer integrating R&D, design and production, and its business covers healthy breathing, HVAC, bathroom hardware, HVAC terminals, security & protection, suspension & support systems and other fields. It has established long-term cooperative relations with many international brands. Besides, as a supplier of healthy household products, in cooperation with Tongji University, Chinese Academy of Sciences and Industrial Technology Research Institute of Taiwan (ITRI), it devotes itself to presenting customers with more competitive product solutions and healthy breathing products including air purifiers, central ventilation systems and central air-conditioning terminal purifiers, and gradually realizing diversification and multi-functionalization in order to gain market acclaim.

Company establishment

2002, WRN set up

2004, the central air-conditioning vent project was introduced;

2006, a large aerodynamic laboratory was established;

2008, WRN Industrial Park was put into operation, opening up a new era for the Company.

2009, ERP system was fully launched;

2012, green coating RPVD technology was successfully developed, and the fresh air purification project was further developed.

2014, phase II workshop with a construction area of 24000 stared its construcion officially.

2017, the Development Center was set up to improve the front end of market and product

Send your message to this supplier

Post a Sourcing Request Now

Related Categories